Members,



The U.S. Army Corps of Engineers (USACE) completed the Phase 1 dredging for the historic project to deepen the Mississippi River Ship Channel (MRSC) to 50 feet on May 7, 2021. The Phase 1 section of the Ship Channel extends from Venice at Mile 13 Above Head of Passes (AHP) to Mile 22 Below Head of Passes (BHP).  The USACE uncovered some depth anomalies with two utility pipelines and one cable that cross under the Ship Channel in the area of Venice from Mile 12 AHP to Mile 11 AHP.  Due to the information uncovered the USACE is working to verify the depth over these structures in this area before the Ship Channel is officially opened up to a deepened draft (50 Feet). The USACE has actively worked to define the extent of this problem by identifying and contacting the listed utility owners and is awaiting updated surveys and operational information for each potential obstruction.  The USACE is working to maintain or restore at least half of the authorized channel width or the central 250 feet of the channel on the Crossings. (Federally authorized channel dimensions remain 45 feet deep by 500 feet wide.)

DUSTPAN DREDGES WORKING ON THE CROSSINGS ABOVE NEW ORLEANS:

HURLEY: The government dustpan dredge HURLEY continues dredging the central 250 feet of channel at Red Eye Crossing (Mile 224 AHP). The HURLEY commenced dredging on the Crossings on Wednesday, May 26, 2021.

WALLACE McGEORGE: The industry dustpan dredge WALLACE McGEORGE continues dredging the central 250 feet of channel at Sardine Point (Mile 219 AHP). The dustpan dredge began dredging on the Crossings on May 20, 2021.

JADWIN: The government dustpan dredge commenced dredging the central 250 feet at Philadelphia Crossing (Mile 183 AHP) earlier today.  The JADWIN’s next assignment will be a quick one at Alhambra Crossing (Mile 190.5 AHP) with no restrictions expected for the White Castle Anchorage. The dustpan dredge is scheduled to head to a shipyard for repairs but is expected to resume dredging on the Crossings in late July.  The JADWIN started dredging on the Crossings on June 24, 2021.

INDUSTRY HOPPER DREDGES WORKING IN THE AREA OF SOUTHWEST PASS (SWP):

NEWPORT: The industry hopper dredge NEWPORT (Manson Construction) continues dredging in the area of the Head of Passes from Mile 2.0 AHP to Mile 1.0 BHP under Southwest Pass Hopper Dredge Rental Contract #7-2020. This contract was awarded to the Manson Construction in Fiscal Year 2020 to perform channel maintenance in Fiscal Year 2021.  The NEWPORT began work under this contract on April 3, 2021.

CUTTERHEAD DREDGE(S) IN THE HOPPER DREDGE DISPOSAL AREA (HDDA):

ILLINOIS: The cutterhead dredge ILLINOIS (Great Lakes Dredge and Dock) has removed and beneficially used approximately 8.0 million cubic yards (mcy) of material from the HDDA under Hopper Dredge Disposal Area Cutterhead Rental Contract #1-2019. The contract includes the removal of 10 mcy in the base with options to add an additional 4 mcy. The project is expected to be completed by early 2022. The material is beneficially being used in the West Bay Receiving Area through a submerged dredge pipeline that will have to be removed up completion of the project. The pipeline retrieval will require at least one complete closure on the Ship Channel in the immediate vicinity of the submerged pipeline (Mile 2.0 AHP to Mile 0 – the Head of Passes).

The Carrollton Gauge (New Orleans) reading at 1600 hours today was 7.35 feet with a 24-hour change of - 0.51 feet.  The National Oceanic and Atmospheric Administration’s (NOAA) National Weather Service Extended Streamflow Prediction (28-Day) for the Carrollton Gauge issued today forecasts stages will slowly fall the next five days and then begin a slow rise to 8.3 feet on July 15 before beginning a slow fall to 5.8 feet on July 28 (2021).  The highest crest recorded on the Carrollton Gauge in 2021 to date is 15.44 feet at 1700 hours on April 16, 2021.

The Baton Rouge Gauge reading at 1100 hours today was 23.98 feet with a 24-hour change of - 0.91 feet. The National Oceanic and Atmospheric Administration’s (NOAA) National Weather Service Extended Streamflow Prediction (28-Day) for the Baton Rouge Gauge issued today predicts stages will slowly fall over the next three days and then begin a slow rise to 27.0 feet on July 13 and then begin  slow fall to 20.2 feet on July 28 (2021).

The graph below is reproduced from NOAA’s National Weather Service website and represents an experimental product to account for the complexity of accurately predicting long-range precipitation.  This forecast projects stage levels based on expected precipitation for 2 days (top) and 16 days (bottom) and was developed within the North American Ensemble Forecast System (NAEFS) computer model and highlights Quantitative Precipitation Forecasts (QPF).  Along with the forecasts, a shaded area is also provided to indicate uncertainty for the forecast each day in the future. These plots are experimental and not an official forecast product.


[NORL1_67_28d_forecast_error_plot.png]



Please utilize the attached reports for complete details including the year to date plot of the Carrollton Gauge levels.

Best Regards,
Sean

Sean M. Duffy, Sr.
Executive Director

Big River Coalition
http://bigrivercoalition.org<http://bigrivercoalition.org/>

Direct Line:    (504) 338-3165
Fax Number:  (888) 254-4553

This E-Mail transmission (and/or the documents accompanying it) may contain information belonging to the sender that is confidential, privileged and/or exempt from disclosure under applicable law.  The information is intended only for the use of the individual(s) or entity named above.  If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or action taken in reliance on the contents of this information is strictly prohibited.  If you have received this E-Mail transmission in error, please immediately notify us by return E-Mail or telephone to arrange for the return of its contents (including any documents).






-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.listserve.louisianamaritime.org/pipermail/louisianadelegation/attachments/20210630/7ca99d63/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 177559 bytes
Desc: image001.png
URL: <http://lists.listserve.louisianamaritime.org/pipermail/louisianadelegation/attachments/20210630/7ca99d63/attachment-0001.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Lower Mississippi River Dredge Update 63021.pdf
Type: application/pdf
Size: 1293207 bytes
Desc: Lower Mississippi River Dredge Update 63021.pdf
URL: <http://lists.listserve.louisianamaritime.org/pipermail/louisianadelegation/attachments/20210630/7ca99d63/attachment-0002.pdf>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Carrollton Gauge Plot Year to Date 63021.pdf
Type: application/pdf
Size: 72996 bytes
Desc: Carrollton Gauge Plot Year to Date 63021.pdf
URL: <http://lists.listserve.louisianamaritime.org/pipermail/louisianadelegation/attachments/20210630/7ca99d63/attachment-0003.pdf>


More information about the Louisianadelegation mailing list